Follow Vision Kerikeri
  • Facebook Social Icon
  • Twitter Social Icon
  • neighbourly

Contact Vision Kerieri

General inquiries visionkerikeri@gmail.com

Become a member

© Vision Kerikeri 2016

Roundabouts: The rules of engagement

April 19, 2016

 

We had a little feedback to our "roundabout roundup" article (28 March) which looked at the landscaping of these in Kerikeri and surrounds.

 

What gets the "blood boiling" is not the design so much as the disregard of, or confusion around, the "rules of engagement" when approaching and transiting a roundabout.

 

Unfortunately, the current road layout in Kerikeri results in particularly heavy traffic flows along Kerikeri Road and with four roundabouts, it is important that we all "do our bit" to ensure that we help to keep the traffic flowing.

 

So here are the rules as they apply to the use of indicators at roundabouts:

 

If you are going 'straight' through a roundabout:

  • don't signal as you come up to the roundabout

  • signal left as you pass the exit before the one you wish to take. At some small roundabouts it may not be possible to give three seconds warning, but it is courteous to give as much indication as you can.

 

If you are turning left at the first exit of a roundabout:

  • signal left as you come up to the roundabout.

 

If you are traveling more than halfway around the roundabout:

  • signal right as you come up to the roundabout

  • signal left as you pass the exit before the one you wish to take.

It is not a bad strategy to refresh our understanding of these from time to time. Let's face it, the liveability of our town is also effected by how we behave on the town's roads. The full rules plus illustrations can be found at the link below.

 

The rules at a roundabout (NZTA)

 

 

 

 

 

 

Subjects

Please reload

Please reload

Please reload

Follow Vision Kerikeri
  • Facebook Social Icon
  • Twitter Social Icon
  • neighbourly
Volunteer

A working bee is held on the first and third Monday of every month from 0830 to 1130.

 

A public planting is usually held in June of each year - details will be posted closer to the date.

 
If you are interested in either of these please contact Rod Brown

More updates
Wairoa Stream Projects